SITEMAP | CHINESE 
Business Units
Address:NO.1 Suzhou Street ,Haidian District,Beijing,China
Post:100080
Tel:010-62536435 62532717
Fax:010-82671300
E-mail:public@greentec.com.cn http://www.greentec.com.cn
 Position:Home > Business Units > The Olympic

The Greentec has played an important role in the field of noise and vibration control for the Olympic Games Match Project, which has achieved the international standard of acoustic environment. Based on the requirement of sustainable development strategy of Beijing city, Greentec, with the project field involving electric power, traffic, civil building and public facilities, devoted much effort to cooperate closely to the design and construction company. Greentec offers the comprehensive solution and the matching EPC project for noise and vibration control to make sure the Olympic Games matching project to achieve the green environment goal.

The picture shows the Beijing International Airport Terminal 3. The Airport Terminal 3, with the total building area 986,000 sq m, is the biggest monomer airport terminal around the world and is the important matching project for the 2008 Olympic Games. And by the end of 2007, Greentec has accomplished the design and goods supplying for the noise reduction of HVAC(heating, ventilating and air-conditioning) systems for Airport Terminal 3.

Copyright by greentec.com.cn. All rights reserved. Technical Support:bonnetech